|
Bailey Ave. Reconstruction
|
Because of the intersection configuration (Heussey Ave runs between Bailey Ave. and McKinley Pkwy.), it was decided to replace the span wire signal with a new span wire signal, essentially configured the same way. Except that now, with a new driveway that goes to the NOCO parking lot, there is a new signal that governs that access.
|
|
They could have used like a single pole configuration for both ways, I know of an intersection here in town that is like that cause of the diagonal type where it's one arm and goes over the intersecton, but I guess they wouldn't have wanted to do that here.