Wiring exercise I finished less than two hours ago!
|
Tonight I finished this final wiring exercise before the exam. It's a overview where we had to install everything we learned to use. I installed absolutely everything that's on this 4' X 8' plywood sheet! Here's what I installed:
- NMD 90 14/2
- 1/2" EMT
- 1/2" rigid PVC
- AC 90 14/2
- Liquid-tight flexible PVC conduit
- Liquid-tight flexible metallic conduit
- TECK 90 14/2
- Rigid metallic tubing
Here's a little challenge: could you recognize ALL of the cables and conduits in the picture?
|
|
1/2" EMT on the far left, 1/2" PVC to the right of the EMT then, 14/2 AC 90. The 14/2 NMD 90 is the wire joining the square range box and the octagon box with the EMT. The flex PVC is between the range box and the 4 X 4 square box. The 14/2 TECK 90 is the black flex with the wires already inside, the flex liquid-tight is the other flex without the wires and finally the rigid is on the far right.
You got all right LOL. I guess you were already familiar with those right?
The most popular is the Redi-board, which has the inside part of the prepayment meter, the 2 socket outlets, the light housing for an up to 60W GLS lamp, or CFL lamp that fits, and the earth leakage breaker, 2 20A MCB's, a 10A MCB and a single spare position if you wanted to wire in more sockets. This is used in low cost houses as a step up from illegal connections, being connected to the actual main breaker via the 10mm ABC cable with the 2 data cores providing communications to the 2 part meter.
Over here rigid is only required in places where explosions are prone to happen. Otherwise you can use EMT, which is much easier to work with.
Yep I've been told by my teacher 1 1/4" was the biggest size possible to bend manually. For bigger there's a special machine for it.
We'll make things easier for you though: it can be EMT if you want, not necessarily rigid